Full tear-off and replacement by experienced BC roofing professionals. Free inspection, written warranty, and fixed-price quotes — no pressure, no hidden line items.
A member of our team will contact you within one business day to schedule your free inspection.
No obligation. No sales pitch. Just straight answers.
Why It Matters
A failing roof doesn't stay contained. The longer it sits, the more it costs — and not just to fix the roof.
How It Works
Materials We Install
We work with IKO, GAF, and Malarkey — the same materials used on premium homes across the Lower Mainland.
What Is Included
This is the scope that appears on a Stonnex shingle replacement quote. Every line is included in the fixed price; if another quote is lower, check which of these is missing.
| System | Installed, before GST | Expected life on the coast | Best suited to |
|---|---|---|---|
| Architectural asphalt shingle | $5.00 to $9.00 per sq ft | 20 to 30 years | Most detached homes; the best value per year of service |
| Impact-rated asphalt | $5.50 to $10.00 per sq ft | 25 to 30 years | Tree-covered lots, wind-exposed sites |
| Cedar shake to shingle conversion | $7.50 to $11.50 per sq ft | 20 to 30 years | Aging cedar roofs; includes the new plywood deck |
| Brava composite shake | Priced per project | 50-year warranty | Character homes that need the cedar look with a Class A fire rating |
| Standing-seam metal | $13.00 to $19.00 per sq ft | 50 years or more | Long-term holds, steep or high roofs, contemporary architecture |
| Two-ply SBS torch-on | $7.00 to $12.00 per sq ft | 20 to 30 years | Flat and low-slope sections, decks over living space |
These are 2026 planning ranges for the Lower Mainland. The full method, four worked examples and every cost driver are in the roof replacement cost guide. For system detail see cedar roof replacement, Brava composite shake, metal roofing and torch-on roofing.
Most detached homes are completed in one to three working days; cedar conversions and metal roofs take three to five. The crew protects landscaping and siding before tear-off, the roof is made watertight before the crew leaves each night, and the site is cleaned and nail-swept daily. On completion you receive photos of the finished work, the written warranty and the manufacturer registration.
Free inspection. Fixed-price written quote. No pressure, no obligation — ever.
Straight answers to what homeowners ask us most.
Most single-family roofs are done in two to four days once we start, depending on size, pitch and the weather. Larger or more complex roofs take longer. We give you a timeline with the quote.
You do not need to move out and you do not need to be home. It is noisy, so plan around it if you work from home or have young children napping. We will need access to the driveway and to power.
It happens on a minority of roofs and you cannot see it until the old roofing is off. We show you the affected area, tell you what it costs to replace before we do it, and you decide. We do not do the work and bill you for it afterwards.
We tear off. Going over an existing layer hides the condition of the decking, adds weight, and shortens the life of the new roof. It also limits what the manufacturer will warrant.
It depends mainly on size, pitch, material and access. We have written a full breakdown of the ranges and what moves them in our 2026 cost guide. For your specific roof, we inspect it and give you a fixed-price quote at no charge.
A manufacturer warranty on the materials, up to 50 years depending on the product, plus a 10-year Stonnex labour warranty on asphalt shingle and metal. Both are explained on our warranty page.